16 KiB
layout | page_title | sidebar_current | description |
---|---|---|---|
guides | Blue/Green & Canary Deployments - Operating a Job | guides-operating-a-job-updating-blue-green-deployments | Nomad has built-in support for doing blue/green and canary deployments to more safely update existing applications and services. |
Blue/Green & Canary Deployments
Sometimes rolling upgrades do not offer the required flexibility for updating an application in production. Often organizations prefer to put a "canary" build into production or utilize a technique known as a "blue/green" deployment to ensure a safe application rollout to production while minimizing downtime.
Blue/Green Deployments
Blue/Green deployments have several other names including Red/Black or A/B, but the concept is generally the same. In a blue/green deployment, there are two application versions. Only one application version is active at a time, except during the transition phase from one version to the next. The term "active" tends to mean "receiving traffic" or "in service".
Imagine a hypothetical API server which has five instances deployed to production at version 1.3, and we want to safely upgrade to version 1.4. We want to create five new instances at version 1.4 and in the case that they are operating correctly we want to promote them and take down the five versions running 1.3. In the event of failure, we can quickly rollback to 1.3.
To start, we examine our job which is running in production:
job "docs" {
# ...
group "api" {
count = 5
update {
max_parallel = 1
canary = 5
min_healthy_time = "30s"
healthy_deadline = "10m"
auto_revert = true
auto_promote = false
}
task "api-server" {
driver = "docker"
config {
image = "api-server:1.3"
}
}
}
}
We see that it has an update
stanza that has the canary
equal to the desired
count. This is what allows us to easily model blue/green deployments. When we
change the job to run the "api-server:1.4" image, Nomad will create 5 new
allocations without touching the original "api-server:1.3" allocations. Below we
can see how this works by changing the image to run the new version:
@@ -2,6 +2,8 @@ job "docs" {
group "api" {
task "api-server" {
config {
- image = "api-server:1.3"
+ image = "api-server:1.4"
Next we plan and run these changes:
$ nomad job plan docs.nomad
+/- Job: "docs"
+/- Task Group: "api" (5 canary, 5 ignore)
+/- Task: "api-server" (forces create/destroy update)
+/- Config {
+/- image: "api-server:1.3" => "api-server:1.4"
}
Scheduler dry-run:
- All tasks successfully allocated.
Job Modify Index: 7
To submit the job with version verification run:
nomad job run -check-index 7 example.nomad
When running the job with the check-index flag, the job will only be run if the
server side version matches the job modify index returned. If the index has
changed, another user has modified the job and the plan's results are
potentially invalid.
$ nomad job run docs.nomad
# ...
We can see from the plan output that Nomad is going to create 5 canaries that are running the "api-server:1.4" image and ignore all the allocations running the older image. Now if we examine the status of the job we can see that both the blue ("api-server:1.3") and green ("api-server:1.4") set are running.
$ nomad status docs
ID = docs
Name = docs
Submit Date = 07/26/17 19:57:47 UTC
Type = service
Priority = 50
Datacenters = dc1
Status = running
Periodic = false
Parameterized = false
Summary
Task Group Queued Starting Running Failed Complete Lost
api 0 0 10 0 0 0
Latest Deployment
ID = 32a080c1
Status = running
Description = Deployment is running but requires manual promotion
Deployed
Task Group Auto Revert Promoted Desired Canaries Placed Healthy Unhealthy
api true false 5 5 5 5 0
Allocations
ID Node ID Task Group Version Desired Status Created At
6d8eec42 087852e2 api 1 run running 07/26/17 19:57:47 UTC
7051480e 087852e2 api 1 run running 07/26/17 19:57:47 UTC
36c6610f 087852e2 api 1 run running 07/26/17 19:57:47 UTC
410ba474 087852e2 api 1 run running 07/26/17 19:57:47 UTC
85662a7a 087852e2 api 1 run running 07/26/17 19:57:47 UTC
3ac3fe05 087852e2 api 0 run running 07/26/17 19:53:56 UTC
4bd51979 087852e2 api 0 run running 07/26/17 19:53:56 UTC
2998387b 087852e2 api 0 run running 07/26/17 19:53:56 UTC
35b813ee 087852e2 api 0 run running 07/26/17 19:53:56 UTC
b53b4289 087852e2 api 0 run running 07/26/17 19:53:56 UTC
Now that we have the new set in production, we can route traffic to it and validate the new job version is working properly. Based on whether the new version is functioning properly or improperly we will either want to promote or fail the deployment.
Promoting the Deployment
After deploying the new image along side the old version we have determined it is functioning properly and we want to transition fully to the new version. Doing so is as simple as promoting the deployment:
$ nomad deployment promote 32a080c1
==> Monitoring evaluation "61ac2be5"
Evaluation triggered by job "docs"
Evaluation within deployment: "32a080c1"
Evaluation status changed: "pending" -> "complete"
==> Evaluation "61ac2be5" finished with status "complete"
If we look at the job's status we see that after promotion, Nomad stopped the older allocations and is only running the new one. This now completes our blue/green deployment.
$ nomad status docs
ID = docs
Name = docs
Submit Date = 07/26/17 19:57:47 UTC
Type = service
Priority = 50
Datacenters = dc1
Status = running
Periodic = false
Parameterized = false
Summary
Task Group Queued Starting Running Failed Complete Lost
api 0 0 5 0 5 0
Latest Deployment
ID = 32a080c1
Status = successful
Description = Deployment completed successfully
Deployed
Task Group Auto Revert Promoted Desired Canaries Placed Healthy Unhealthy
api true true 5 5 5 5 0
Allocations
ID Node ID Task Group Version Desired Status Created At
6d8eec42 087852e2 api 1 run running 07/26/17 19:57:47 UTC
7051480e 087852e2 api 1 run running 07/26/17 19:57:47 UTC
36c6610f 087852e2 api 1 run running 07/26/17 19:57:47 UTC
410ba474 087852e2 api 1 run running 07/26/17 19:57:47 UTC
85662a7a 087852e2 api 1 run running 07/26/17 19:57:47 UTC
3ac3fe05 087852e2 api 0 stop complete 07/26/17 19:53:56 UTC
4bd51979 087852e2 api 0 stop complete 07/26/17 19:53:56 UTC
2998387b 087852e2 api 0 stop complete 07/26/17 19:53:56 UTC
35b813ee 087852e2 api 0 stop complete 07/26/17 19:53:56 UTC
b53b4289 087852e2 api 0 stop complete 07/26/17 19:53:56 UTC
Failing the Deployment
After deploying the new image alongside the old version we have determined it is not functioning properly and we want to roll back to the old version. Doing so is as simple as failing the deployment:
$ nomad deployment fail 32a080c1
Deployment "32a080c1-de5a-a4e7-0218-521d8344c328" failed. Auto-reverted to job version 0.
==> Monitoring evaluation "6840f512"
Evaluation triggered by job "example"
Evaluation within deployment: "32a080c1"
Allocation "0ccb732f" modified: node "36e7a123", group "cache"
Allocation "64d4f282" modified: node "36e7a123", group "cache"
Allocation "664e33c7" modified: node "36e7a123", group "cache"
Allocation "a4cb6a4b" modified: node "36e7a123", group "cache"
Allocation "fdd73bdd" modified: node "36e7a123", group "cache"
Evaluation status changed: "pending" -> "complete"
==> Evaluation "6840f512" finished with status "complete"
If we now look at the job's status we can see that after failing the deployment, Nomad stopped the new allocations and is only running the old ones and reverted the working copy of the job back to the original specification running "api-server:1.3".
$ nomad status docs
ID = docs
Name = docs
Submit Date = 07/26/17 19:57:47 UTC
Type = service
Priority = 50
Datacenters = dc1
Status = running
Periodic = false
Parameterized = false
Summary
Task Group Queued Starting Running Failed Complete Lost
api 0 0 5 0 5 0
Latest Deployment
ID = 6f3f84b3
Status = successful
Description = Deployment completed successfully
Deployed
Task Group Auto Revert Desired Placed Healthy Unhealthy
cache true 5 5 5 0
Allocations
ID Node ID Task Group Version Desired Status Created At
27dc2a42 36e7a123 api 1 stop complete 07/26/17 20:07:31 UTC
5b7d34bb 36e7a123 api 1 stop complete 07/26/17 20:07:31 UTC
983b487d 36e7a123 api 1 stop complete 07/26/17 20:07:31 UTC
d1cbf45a 36e7a123 api 1 stop complete 07/26/17 20:07:31 UTC
d6b46def 36e7a123 api 1 stop complete 07/26/17 20:07:31 UTC
0ccb732f 36e7a123 api 2 run running 07/26/17 20:06:29 UTC
64d4f282 36e7a123 api 2 run running 07/26/17 20:06:29 UTC
664e33c7 36e7a123 api 2 run running 07/26/17 20:06:29 UTC
a4cb6a4b 36e7a123 api 2 run running 07/26/17 20:06:29 UTC
fdd73bdd 36e7a123 api 2 run running 07/26/17 20:06:29 UTC
$ nomad job deployments docs
ID Job ID Job Version Status Description
6f3f84b3 example 2 successful Deployment completed successfully
32a080c1 example 1 failed Deployment marked as failed - rolling back to job version 0
c4c16494 example 0 successful Deployment completed successfully
Canary Deployments
Canary updates are a useful way to test a new version of a job before beginning
a rolling upgrade. The update
stanza supports setting the number of canaries
the job operator would like Nomad to create when the job changes via the
canary
parameter. When the job specification is updated, Nomad creates the
canaries without stopping any allocations from the previous job.
This pattern allows operators to achieve higher confidence in the new job version because they can route traffic, examine logs, etc, to determine the new application is performing properly.
job "docs" {
# ...
group "api" {
count = 5
update {
max_parallel = 1
canary = 1
min_healthy_time = "30s"
healthy_deadline = "10m"
auto_revert = true
auto_promote = false
}
task "api-server" {
driver = "docker"
config {
image = "api-server:1.3"
}
}
}
}
In the example above, the update
stanza tells Nomad to create a single canary
when the job specification is changed. Below we can see how this works by
changing the image to run the new version:
@@ -2,6 +2,8 @@ job "docs" {
group "api" {
task "api-server" {
config {
- image = "api-server:1.3"
+ image = "api-server:1.4"
Next we plan and run these changes:
$ nomad job plan docs.nomad
+/- Job: "docs"
+/- Task Group: "api" (1 canary, 5 ignore)
+/- Task: "api-server" (forces create/destroy update)
+/- Config {
+/- image: "api-server:1.3" => "api-server:1.4"
}
Scheduler dry-run:
- All tasks successfully allocated.
Job Modify Index: 7
To submit the job with version verification run:
nomad job run -check-index 7 example.nomad
When running the job with the check-index flag, the job will only be run if the
server side version matches the job modify index returned. If the index has
changed, another user has modified the job and the plan's results are
potentially invalid.
$ nomad job run docs.nomad
# ...
We can see from the plan output that Nomad is going to create 1 canary that will run the "api-server:1.4" image and ignore all the allocations running the older image. If we inspect the status we see that the canary is running along side the older version of the job:
$ nomad status docs
ID = docs
Name = docs
Submit Date = 07/26/17 19:57:47 UTC
Type = service
Priority = 50
Datacenters = dc1
Status = running
Periodic = false
Parameterized = false
Summary
Task Group Queued Starting Running Failed Complete Lost
api 0 0 6 0 0 0
Latest Deployment
ID = 32a080c1
Status = running
Description = Deployment is running but requires manual promotion
Deployed
Task Group Auto Revert Promoted Desired Canaries Placed Healthy Unhealthy
api true false 5 1 1 1 0
Allocations
ID Node ID Task Group Version Desired Status Created At
85662a7a 087852e2 api 1 run running 07/26/17 19:57:47 UTC
3ac3fe05 087852e2 api 0 run running 07/26/17 19:53:56 UTC
4bd51979 087852e2 api 0 run running 07/26/17 19:53:56 UTC
2998387b 087852e2 api 0 run running 07/26/17 19:53:56 UTC
35b813ee 087852e2 api 0 run running 07/26/17 19:53:56 UTC
b53b4289 087852e2 api 0 run running 07/26/17 19:53:56 UTC
Now if we promote the canary, this will trigger a rolling update to replace the
remaining allocations running the older image. The rolling update will happen at
a rate of max_parallel
, so in this case one allocation at a time:
$ nomad deployment promote 37033151
==> Monitoring evaluation "37033151"
Evaluation triggered by job "docs"
Evaluation within deployment: "ed28f6c2"
Allocation "f5057465" created: node "f6646949", group "cache"
Allocation "f5057465" status changed: "pending" -> "running"
Evaluation status changed: "pending" -> "complete"
==> Evaluation "37033151" finished with status "complete"
$ nomad status docs
ID = docs
Name = docs
Submit Date = 07/26/17 20:28:59 UTC
Type = service
Priority = 50
Datacenters = dc1
Status = running
Periodic = false
Parameterized = false
Summary
Task Group Queued Starting Running Failed Complete Lost
api 0 0 5 0 2 0
Latest Deployment
ID = ed28f6c2
Status = running
Description = Deployment is running
Deployed
Task Group Auto Revert Promoted Desired Canaries Placed Healthy Unhealthy
api true true 5 1 2 1 0
Allocations
ID Node ID Task Group Version Desired Status Created At
f5057465 f6646949 api 1 run running 07/26/17 20:29:23 UTC
b1c88d20 f6646949 api 1 run running 07/26/17 20:28:59 UTC
1140bacf f6646949 api 0 run running 07/26/17 20:28:37 UTC
1958a34a f6646949 api 0 run running 07/26/17 20:28:37 UTC
4bda385a f6646949 api 0 run running 07/26/17 20:28:37 UTC
62d96f06 f6646949 api 0 stop complete 07/26/17 20:28:37 UTC
f58abbb2 f6646949 api 0 stop complete 07/26/17 20:28:37 UTC
Alternatively, if the canary was not performing properly, we could abandon the
change using the nomad deployment fail
command, similar to the blue/green
example.