1.6 KiB
layout | page_title | sidebar_current | description |
---|---|---|---|
docs | update Stanza - Job Specification | docs-job-specification-update | The "update" stanza specifies the job update strategy. The update strategy is used to control things like rolling upgrades. If omitted, rolling updates are disabled. |
update
Stanza
Placement |
job -> **update**
|
---|
The update
stanza specifies the job update strategy. The update strategy is
used to control things like rolling upgrades. If omitted, rolling updates are
disabled.
job "docs" {
update {
max_parallel = 3
stagger = "30s"
}
}
update
Parameters
-
max_parallel
(int: 0)
- Specifies the number of task groups that can be updated at the same time. -
stagger
(string: "0ms")
- Specifies the delay between sets of updates. This is specified using a label suffix like "30s" or "1h".
update
Examples
The following examples only show the update
stanzas. Remember that the
update
stanza is only valid in the placements listed above.
Serial Upgrades
This example uses a serial upgrade strategy, meaning exactly one task group will be updated at a time, waiting 60 seconds until the next task group is upgraded.
update {
max_parallel = 1
stagger = "60s"
}
Parallel Upgrades
This example performs 10 upgrades at a time, waiting 30 seconds before moving on to the next batch:
update {
max_parallel = 10
stagger = "30s"
}