This fixes a confusing UX where a previously successful deployment's
healthy/unhealthy count would get updated if any allocations failed after
the deployment was already marked as successful.
This command will be used to send a signal to either a single task within an
allocation, or all of the tasks if <task-name> is omitted. If the sent signal
terminates the allocation, it will be treated as if the allocation has crashed,
rather than as if it was operator-terminated.
Signal validation is currently handled by the driver itself and nomad
does not attempt to restrict or validate them.
Currently, when logmon fails to reattach, we will retry reattachment to
the same pid until the task restart specification is exhausted.
Because we cannot clear hook state during error conditions, it is not
possible for us to signal to a future restart that it _shouldn't_
attempt to reattach to the plugin.
Here we revert to explicitly detecting reattachment seperately from a
launch of a new logmon, so we can recover from scenarios where a logmon
plugin has failed.
This is a net improvement over the current hard failure situation, as it
means in the most common case (the pid has gone away), we can recover.
Other reattachment failure modes where the plugin may still be running
could potentially cause a duplicate process, or a subsequent failure to launch
a new plugin.
If there was a duplicate process, it could potentially cause duplicate
logging. This is better than a production workload outage.
If there was a subsequent failure to launch a new plugin, it would fail
in the same (retry until restarts are exhausted) as the current failure
mode.
This adds a `nomad alloc restart` command and api that allows a job operator
with the alloc-lifecycle acl to perform an in-place restart of a Nomad
allocation, or a given subtask.
Remove runLaunched tracking as Run is *always* called for killable
TaskRunners. TaskRunners which fail before Run can be called (during
NewTaskRunner or Restore) are not killable as they're never added to the
client's alloc map.
I chose to make them more of integration tests since there's a lot more
plumbing involved. The internal implementation details of how we craft
task envs can now change and these tests will still properly assert the
task runtime environment is setup properly.
Some of the context uses in TR hooks are useless (Killed during Stop
never seems meaningful).
None of the hooks are interruptable for graceful shutdown which is
unfortunate and probably needs fixing.
Builds upon earlier commit that cleans up restored handles of terminal
allocs by also emitting terminated events and calling exited hooks when
appropriate.
The test is sadly quite complicated and peeks into things (logmon's
reattach config) AR doesn't normally have access to.
However, I couldn't find another way of asserting logmon got cleaned up
without resorting to smaller unit tests. Smaller unit tests risk
re-implementing dependencies in an unrealistic way, so I opted for an
ugly integration test.
This commit is a significant change. TR.Run is now always executed, even
for terminal allocations. This was changed to allow TR.Run to cleanup
(run stop hooks) if a handle was recovered.
This is intended to handle the case of Nomad receiving a
DesiredStatus=Stop allocation update, persisting it, but crashing before
stopping AR/TR.
The commit also renames task runner hook data as it was very easy to
accidently set state on Requests instead of Responses using the old
field names.
This code chooses to be conservative as opposed to optimal: when failing
to reattach to logmon simply return a recoverable error instead of
immediately trying to restart logmon.
The recoverable error will cause the task's restart policy to be
applied and a new logmon will be launched upon restart.
Trying to do the optimal approach of simply starting a new logmon
requires error string comparison and should be tested against a task
actively logging to assert the behavior (are writes blocked? dropped?).
There were multiple bugs here:
1. Reattach unmarshalling always returned an error because you can't
unmarshal into a nil pointer.
2. The hook data wasn't being saved because it was put on the request
struct, not the response struct.
3. The plugin configuration should only have reattach *or* a command
set. Not both.
4. Setting Done=true meant the hook was never re-run on agent restart so
reattaching was never attempted.
Track the download status of each artifact independently so that if only
one of many artifacts fails to download, completed artifacts aren't
downloaded again.
0.9.0beta2 contains a regression where artifact download errors would
not cause a task restart and instead immediately fail the task.
This restores the pre-0.9 behavior of retrying all artifact errors and
adds missing tests.
Fixes an issue where if a task was restarted after restating the client,
the task dir environment variables would not be populated. This PR fixes
this for both upgrades from 0.8.X and for normal 0.9 restarts.
Added ability to adjust the number of events the TaskRunner keeps as
there's no way to observe all events otherwise.
Task events differ slightly from 0.8 because 0.9 emits Terminated every
time a task exits instead of only when it exits on its own (not due to
restart or kill).
0.9 does not emit Killing/Killed for restarts like 0.8 which seems fine
as `Restart Signaled/Terminated/Restarting` is more descriptive.
Original v0.8 events emitted:
```
expected := []string{
"Received",
"Task Setup",
"Started",
"Restart Signaled",
"Killing",
"Killed",
"Restarting",
"Started",
"Restart Signaled",
"Killing",
"Killed",
"Restarting",
"Started",
"Restart Signaled",
"Killing",
"Killed",
"Not Restarting",
}
```
v0.9.0-dev started emitting a Terminated event every time a task process
exited. While this wasn't true in previous versions, it's a useful task
event because it's the only place for job operators to view the task's
exit code.
This behavior is asserted in the e2e/taskevents tests.