Fix numerous go-getter security issues:
- Add timeouts to http, git, and hg operations to prevent DoS
- Add size limit to http to prevent resource exhaustion
- Disable following symlinks in both artifacts and `job run`
- Stop performing initial HEAD request to avoid file corruption on
retries and DoS opportunities.
**Approach**
Since Nomad has no ability to differentiate a DoS-via-large-artifact vs
a legitimate workload, all of the new limits are configurable at the
client agent level.
The max size of HTTP downloads is also exposed as a node attribute so
that if some workloads have large artifacts they can specify a high
limit in their jobspecs.
In the future all of this plumbing could be extended to enable/disable
specific getters or artifact downloading entirely on a per-node basis.
* add concurrent download support - resolves#11244
* format imports
* mark `wg.Done()` via `defer`
* added tests for successful and failure cases and resolved some goleak
* docs: add changelog for #11531
* test typo fixes and improvements
Co-authored-by: Michael Schurter <mschurter@hashicorp.com>
This commit is a significant change. TR.Run is now always executed, even
for terminal allocations. This was changed to allow TR.Run to cleanup
(run stop hooks) if a handle was recovered.
This is intended to handle the case of Nomad receiving a
DesiredStatus=Stop allocation update, persisting it, but crashing before
stopping AR/TR.
The commit also renames task runner hook data as it was very easy to
accidently set state on Requests instead of Responses using the old
field names.
Track the download status of each artifact independently so that if only
one of many artifacts fails to download, completed artifacts aren't
downloaded again.
0.9.0beta2 contains a regression where artifact download errors would
not cause a task restart and instead immediately fail the task.
This restores the pre-0.9 behavior of retrying all artifact errors and
adds missing tests.