* Persist shared allocated ports for inplace update
Ports were not copied over when performing inplace updates in the
generic scheduler
* changelog
* drop spew
* use msgtype in upsert node
adds message type to signature for upsert node, update tests, remove placeholder method
* UpsertAllocs msg type test setup
* use upsertallocs with msg type in signature
update test usage of delete node
delete placeholder msgtype method
* add msgtype to upsert evals signature, update test call sites with test setup msg type
handle snapshot upsert eval outside of FSM and ignore eval event
remove placeholder upsertevalsmsgtype
handle job plan rpc and prevent event creation for plan
msgtype cleanup upsertnodeevents
updatenodedrain msgtype
msg type 0 is a node registration event, so set the default to the ignore type
* fix named import
* fix signature ordering on upsertnode to match
The change was intended to fix a case where a canary alloc may fail to
be rescheduled if all the other allocs fail as well (e.g. if all allocs
happen to be placed on a node that died). However, it introduced some
unintended side-effects.
Reverting the change for now and will investigate further.
This change fixes a bug where lost/failed allocations are replaced by
allocations with the latest versions, even if the version hasn't been
promoted yet.
Now, when generating a plan for lost/failed allocations, the scheduler
first checks if the current deployment is in Canary stage, and if so, it
ensures that any lost/failed allocations is replaced one with the latest
promoted version instead.
The field name `Deployment.TaskGroups` contains a map of `DeploymentState`,
which makes it a little harder to follow state updates when combined with
inconsistent naming conventions, particularly when we also have the state
store or actual `TaskGroup`s in scope. This changeset changes all uses to
`dstate` so as not to be confused with actual TaskGroups.
* client/heartbeatstop: reversed time condition for startup grace
* scheduler/generic_sched: use `delayInstead` to avoid a loop
Without protecting the loop that creates followUpEvals, a delayed eval
is allowed to create an immediate subsequent delayed eval. For both
`stop_after_client_disconnect` and the `reschedule` block, a delayed
eval should always produce some immediate result (running or blocked)
and then only after the outcome of that eval produce a second delayed
eval.
* scheduler/reconcile: lostLater are different than delayedReschedules
Just slightly. `lostLater` allocs should be used to create batched
evaluations, but `handleDelayedReschedules` assumes that the
allocations are in the untainted set. When it creates the in-place
updates to those allocations at the end, it causes the allocation to
be treated as running over in the planner, which causes the initial
`stop_after_client_disconnect` evaluation to be retried by the worker.
* jobspec, api: add stop_after_client_disconnect
* nomad/state/state_store: error message typo
* structs: alloc methods to support stop_after_client_disconnect
1. a global AllocStates to track status changes with timestamps. We
need this to track the time at which the alloc became lost
originally.
2. ShouldClientStop() and WaitClientStop() to actually do the math
* scheduler/reconcile_util: delayByStopAfterClientDisconnect
* scheduler/reconcile: use delayByStopAfterClientDisconnect
* scheduler/util: updateNonTerminalAllocsToLost comments
This was setup to only update allocs to lost if the DesiredStatus had
already been set by the scheduler. It seems like the intention was to
update the status from any non-terminal state, and not all lost allocs
have been marked stop or evict by now
* scheduler/testing: AssertEvalStatus just use require
* scheduler/generic_sched: don't create a blocked eval if delayed
* scheduler/generic_sched_test: several scheduling cases
If an alloc is being preempted and marked as evict, but the underlying
node is lost before the migration takes place, the allocation currently
stays as desired evict, status running forever, or until the node comes
back online.
This commit updates updateNonTerminalAllocsToLost to check for a
destired status of Evict as well as Stop when updating allocations on
tainted nodes.
switch to table test for lost node cases
Fixes#5856
When the scheduler looks for a placement for an allocation that's
replacing another allocation, it's supposed to penalize the previous
node if the allocation had been rescheduled or failed. But we're
currently always penalizing the node, which leads to unnecessary
migrations on job update.
This commit leaves in place the existing behavior where if the
previous alloc was itself rescheduled, its previous nodes are also
penalized. This is conservative but the right behavior especially on
larger clusters where a group of hosts might be having correlated
trouble (like an AZ failure).
Co-Authored-By: Michael Schurter <mschurter@hashicorp.com>
Currently, when an alloc fails and is rescheduled, the alloc desired
state remains as "run" and the nomad client may not free the resources.
Here, we ensure that an alloc is marked as stopped when it's
rescheduled.
Notice the Desired Status and Description before and after this change:
Before:
```
mars-2:nomad notnoop$ nomad alloc status 02aba49e
ID = 02aba49e
Eval ID = bb9ed1d2
Name = example-reschedule.nodes[0]
Node ID = 5853d547
Node Name = mars-2.local
Job ID = example-reschedule
Job Version = 0
Client Status = failed
Client Description = Failed tasks
Desired Status = run
Desired Description = <none>
Created = 10s ago
Modified = 5s ago
Replacement Alloc ID = d6bf872b
Task "payload" is "dead"
Task Resources
CPU Memory Disk Addresses
0/100 MHz 24 MiB/300 MiB 300 MiB
Task Events:
Started At = 2019-06-06T21:12:45Z
Finished At = 2019-06-06T21:12:50Z
Total Restarts = 0
Last Restart = N/A
Recent Events:
Time Type Description
2019-06-06T17:12:50-04:00 Not Restarting Policy allows no restarts
2019-06-06T17:12:50-04:00 Terminated Exit Code: 1
2019-06-06T17:12:45-04:00 Started Task started by client
2019-06-06T17:12:45-04:00 Task Setup Building Task Directory
2019-06-06T17:12:45-04:00 Received Task received by client
```
After:
```
ID = 5001ccd1
Eval ID = 53507a02
Name = example-reschedule.nodes[0]
Node ID = a3b04364
Node Name = mars-2.local
Job ID = example-reschedule
Job Version = 0
Client Status = failed
Client Description = Failed tasks
Desired Status = stop
Desired Description = alloc was rescheduled because it failed
Created = 13s ago
Modified = 3s ago
Replacement Alloc ID = 7ba7ac20
Task "payload" is "dead"
Task Resources
CPU Memory Disk Addresses
21/100 MHz 24 MiB/300 MiB 300 MiB
Task Events:
Started At = 2019-06-06T21:22:50Z
Finished At = 2019-06-06T21:22:55Z
Total Restarts = 0
Last Restart = N/A
Recent Events:
Time Type Description
2019-06-06T17:22:55-04:00 Not Restarting Policy allows no restarts
2019-06-06T17:22:55-04:00 Terminated Exit Code: 1
2019-06-06T17:22:50-04:00 Started Task started by client
2019-06-06T17:22:50-04:00 Task Setup Building Task Directory
2019-06-06T17:22:50-04:00 Received Task received by client
```
Fix `TestServiceSched_NodeDown` for checking that the migrated allocs
are actually marked to be stopped.
The boolean logic in test made it skip actually checking client status
as long as desired status was stop.
Here, we mark some jobs for migration while leaving others as running,
and we check that lost flag is only set for non-migrated allocs.