Nomad supports blue/green and canary deployments through the declarative job
|
|
|
|
file syntax. By specifying multiple task groups, Nomad allows for easy
|
|
|
|
configuration and rollout of blue/green and canary deployments.
|
|
|
|
---
|
|
|
|
|
|
|
|
# Blue/Green & Canary Deployments
|
|
|
|
|
|
|
|
Sometimes [rolling
|
|
|
|
upgrades](/docs/operating-a-job/update-strategies/rolling-upgrades.html) do not
|
|
|
|
offer the required flexibility for updating an application in production. Often
|
|
|
|
organizations prefer to put a "canary" build into production or utilize a
|
|
|
|
technique known as a "blue/green" deployment to ensure a safe application
|
|
|
|
rollout to production while minimizing downtime.
|
|
|
|
|
|
|
|
Blue/Green deployments have several other names including Red/Black or A/B, but
|
|
|
|
the concept is generally the same. In a blue/green deployment, there are two
|
|
|
|
application versions. Only one application version is active at a time, except
|
|
|
|
during the transition phase from one version to the next. The term "active"
|
|
|
|
tends to mean "receiving traffic" or "in service".
|
|
|
|
|
|
|
|
Imagine a hypothetical API server which has ten instances deployed to production
|
|
|
|
at version 1.3, and we want to safely upgrade to version 1.4. After the new
|
|
|
|
version has been approved to production, we may want to do a small rollout. In
|
|
|
|
the event of failure, we can quickly rollback to 1.3.
|
|
|
|
|
|
|
|
To start, version 1.3 is considered the active set and version 1.4 is the
|
|
|
|
desired set. Here is a sample job file which models the transition from version
|
|
|
|
1.3 to version 1.4 using a blue/green deployment.
|
|
|
|
|
|
|
|
```hcl
|
|
|
|
job "docs" {
|
|
|
|
datacenters = ["dc1"]
|
|
|
|
|
|
|
|
group "api-green" {
|
|
|
|
count = 10
|
|
|
|
|
|
|
|
task "api-server" {
|
|
|
|
driver = "docker"
|
|
|
|
|
|
|
|
config {
|
|
|
|
image = "api-server:1.3"
|
|
|
|
}
|
|
|
|
}
|
|
|
|
}
|
|
|
|
|
|
|
|
group "api-blue" {
|
|
|
|
count = 0
|
|
|
|
|
|
|
|
task "api-server" {
|
|
|
|
driver = "docker"
|
|
|
|
|
|
|
|
config {
|
|
|
|
image = "api-server:1.4"
|
|
|
|
}
|
|
|
|
}
|
|
|
|
}
|
|
|
|
}
|
|
|
|
```
|
|
|
|
|
|
|
|
It is clear that the active group is "api-green" since it has a non-zero count.
|
|
|
|
To transition to v1.4 (api-blue), we increase the count of api-blue to match
|
|
|
|
that of api-green.
|
|
|
|
|
|
|
|
```diff
|
|
|
|
@@ -2,6 +2,8 @@ job "docs" {
|
|
|
|
group "api-blue" {
|
|
|
|
- count = 0
|
|
|
|
+ count = 10
|
|
|
|
|
|
|
|
task "api-server" {
|
|
|
|
driver = "docker"
|
|
|
|
```
|
|
|
|
|
|
|
|
Next we plan and run these changes:
|
|
|
|
|
|
|
|
```shell
|
|
|
|
$ nomad plan docs.nomad
|
|
|
|
```
|
|
|
|
|
|
|
|
Assuming the plan output looks okay, we are ready to run these changes.
|
|
|
|
|
|
|
|
```shell
|
|
|
|
$ nomad run docs.nomad
|
|
|
|
```
|
|
|
|
|
|
|
|
Our deployment is not yet finished. We are currently running at double capacity,
|
|
|
|
so approximately half of our traffic is going to the blue and half is going to
|
|
|
|
green. Usually we inspect our monitoring and reporting system. If we are
|
|
|
|
experiencing errors, we reduce the count of "api-blue" back to 0. If we are
|
|
|
|
running successfully, we change the count of "api-green" to 0.
|
|
|
|
|
|
|
|
```diff
|
|
|
|
@@ -2,6 +2,8 @@ job "docs" {
|
|
|
|
group "api-green" {
|
|
|
|
- count = 10
|
|
|
|
+ count = 0
|
|
|
|
|
|
|
|
task "api-server" {
|
|
|
|
driver = "docker"
|
|
|
|
```
|
|
|
|
|
|
|
|
The next time we want to do a deployment, the "green" group becomes our
|
|
|
|
transition group, since the "blue" group is currently active.
|
|
|
|
|
|
|
|
## Canary Deployments
|
|
|
|
|
|
|
|
A canary deployment is a special type of blue/green deployment in which a subset
|
|
|
|
of nodes continues to run in production for an extended period of time.
|
|
|
|
Sometimes this is done for logging/analytics or as an extended blue/green
|
|
|
|
deployment. Whatever the reason, Nomad supports canary deployments. Using the
|
|
|
|
same strategy as defined above, simply keep the "blue" at a lower number, for
|
|
|
|
example:
|
|
|
|
|
|
|
|
```hcl
|
|
|
|
job "docs" {
|
|
|
|
datacenters = ["dc1"]
|
|
|
|
|
|
|
|
group "api" {
|
|
|
|
count = 10
|
|
|
|
|
|
|
|
task "api-server" {
|
|
|
|
driver = "docker"
|
|
|
|
|
|
|
|
config {
|
|
|
|
image = "api-server:1.3"
|
|
|
|
}
|
|
|
|
}
|
|
|
|
}
|
|
|
|
|
|
|
|
group "api-canary" {
|
|
|
|
count = 1
|
|
|
|
|
|
|
|
task "api-server" {
|
|
|
|
driver = "docker"
|
|
|
|
|
|
|
|
config {
|
|
|
|
image = "api-server:1.4"
|
|
|
|
}
|
|
|
|
}
|
|
|
|
}
|
|
|
|
}
|
|
|
|
```
|
|
|
|
|
|
|
|
Here you can see there is exactly one canary version of our application (v1.4)
|
|
|
|
and ten regular versions. Typically canary versions are also tagged
|
2016-10-28 00:36:26 +00:00
|
|
|
appropriately in the [service discovery](/docs/service-discovery/index.html)
|
2016-10-12 00:15:30 +00:00
|
|
|
layer to prevent unnecessary routing.
|