Commit Graph

13 Commits

Author SHA1 Message Date
Chris Piraino 3dd0b59793
Allow users to configure either unstructured or JSON logging (#7130)
* hclog Allow users to choose between unstructured and JSON logging
2020-01-28 17:50:41 -06:00
Matt Keeler a34f8c751e
Pass a testing.T into NewTestAgent and TestAgent.Start (#5342)
This way we can avoid unnecessary panics which cause other tests not to run.

This doesn't remove all the possibilities for panics causing other tests not to run, it just fixes the TestAgent
2019-02-14 10:59:14 -05:00
Paul Banks bc5333905a
connect: remove additional trust-domain validation (#4934)
* connct: Remove additional trust-domain validation

* Comment typos

* Update connect_ca.go
2018-11-12 20:20:12 +00:00
Matt Keeler 62c631368d
Connect: Verify the leaf cert to determine its readiness. (#4540)
This improves the checking so that if a certificate were to expire or the roots changed then we will go into a non-ready state.

This parses the x509 certificates from the TLS certificate when the leaf is set. The readyCh will be closed whenever a parseable certificate is set and the ca roots are set. This does not mean that the certificate is valid but that it has been setup and is generally valid. The Ready function will now do x509 certificate verification which will in addition to verifying the signatures with the installed CA roots will also verify the certificate isn't expired or not set to become valid in the future. 

The correct way to use these functions is to wait for the ReadyWait chan to be closed and then periodically check the readiness to determine if the certificate is currently useable.
2018-09-07 10:58:06 -04:00
Pierre Souchay e974ebd62e Fixed flaky tests (#4626) 2018-09-04 12:31:51 +01:00
Paul Banks 834ed1d25f
Fixed many tests after rebase. Some still failing and seem unrelated to any connect changes. 2018-06-14 09:42:16 -07:00
Paul Banks 02ab461dae
TLS watching integrated into Service with some basic tests.
There are also a lot of small bug fixes found when testing lots of things end-to-end for the first time and some cleanup now it's integrated with real CA code.
2018-06-14 09:42:07 -07:00
Paul Banks 53dc914d21
Refactor reloadableTLSConfig and verifyier shenanigans into simpler dynamicTLSConfig 2018-06-14 09:42:05 -07:00
Paul Banks 216e74b4ad
Connect verification and AuthZ 2018-06-14 09:42:05 -07:00
Paul Banks 9d11cd9bf4
Fix various test failures and vet warnings.
Intention de-duplication in previously merged PR actualy failed some tests that were not caught be me or CI. I ran the test files for state changes but they happened not to trigger this case so I made sure they did first and then fixed. That fixed some upstream intention endpoint tests that I'd not run as part of testing the previous fix.
2018-06-14 09:41:58 -07:00
Paul Banks 51b1bc028d
Rework connect/proxy and command/connect/proxy. End to end demo working again 2018-06-14 09:41:57 -07:00
Paul Banks 2d6a2ce1e3
connect.Service based implementation after review feedback. 2018-06-14 09:41:56 -07:00
Paul Banks 800deb693c
Original proxy and connect.Client implementation. Working end to end. 2018-06-14 09:41:56 -07:00