* add test-integrations workflow
* add test-integrations success job
* update vault integration testing versions (#16949)
* change parallelism to 4 forgotestsum. use env.CONSUL_VERSION so we can see the version.
* use env for repeated values
* match test to circleci
* fix envvar
* fix envvar 2
* fix envvar 3
* fix envvar 4
* fix envvar 5
* make upgrade and compatibility tests match circleci
* run go env to check environment
* debug docker
Signed-off-by: Dan Bond <danbond@protonmail.com>
* debug docker
Signed-off-by: Dan Bond <danbond@protonmail.com>
* revert debug docker
Signed-off-by: Dan Bond <danbond@protonmail.com>
* going back to command that worked 5 days ago for compatibility tests
* Update Envoy versions to reflect changes in #16889
* cd to test dir
* try running ubuntu latest
* update PR with latest changes that work in enterprise
* yaml still sucks
* test GH fix (localhost resolution)
* change for testing
* test splitting and ipv6 lookup for compatibility and upgrade tests
* fix indention
* consul as image name
* remove the on push
* add gotestsum back in
* removing the use of the gotestsum download action
* yaml sucks today just like yesterday
* fixing nomad tests
* worked out the kinks on enterprise
---------
Signed-off-by: Dan Bond <danbond@protonmail.com>
Co-authored-by: John Eikenberry <jae@zhar.net>
Co-authored-by: Dan Bond <danbond@protonmail.com>
Co-authored-by: Nathan Coleman <nathan.coleman@hashicorp.com>
Co-authored-by: Sarah <sthompson@hashicorp.com>
* add ability to start container tests in debug mode and attach a debugger to consul while running it.
* add a debug message with the debug port
* use pod to get the right port
* fix image used in basic test
* add more data to identify which container to debug.
* fix comment
Co-authored-by: Evan Culver <eculver@users.noreply.github.com>
* rename debugUri to debugURI
---------
Co-authored-by: Evan Culver <eculver@users.noreply.github.com>
This commit adds the PrioritizeByLocality field to both proxy-config
and service-resolver config entries for locality-aware routing. The
field is currently intended for enterprise only, and will be used to
enable prioritization of service-mesh connections to services based
on geographical region / zone.
- added Sameness Group to config entries
- added Sameness Group to subscriptions
* generated proto files
* added Sameness Group events to the state store
- added test cases
* Refactored health RPC Client
- moved code that is common to rpcclient under rpcclient common.go. This will help set us up to support future RPC clients
* Refactored proxycfg glue views
- Moved views to rpcclient config entry. This will allow us to reuse this code for a config entry client
* added config entry RPC Client
- Copied most of the testing code from rpcclient/health
* hooked up new rpcclient in agent
* fixed documentation and comments for clarity
* circleci: remove fronted jobs
Signed-off-by: Dan Bond <danbond@protonmail.com>
* remove frontend-cache
Signed-off-by: Dan Bond <danbond@protonmail.com>
---------
Signed-off-by: Dan Bond <danbond@protonmail.com>
* Add a test to reproduce the race condition
* Fix race condition by publishing the event after the commit and adding a lock to prevent out of order events.
* split publish to generate the list of events before committing the transaction.
* add changelog
* remove extra func
* Apply suggestions from code review
Co-authored-by: Dan Upton <daniel@floppy.co>
* add comment to explain test
---------
Co-authored-by: Dan Upton <daniel@floppy.co>
Prior to this change, peer services would be targeted by service-default
overrides as long as the new `peer` field was not found in the config entry.
This commit removes that deprecated backwards-compatibility behavior. Now
it is necessary to specify the `peer` field in order for upstream overrides
to apply to a peer upstream.
The old setting of 24 hours was not enough time to deal with an expiring certificates. This change ups it to 28 days OR 40% of the full cert duration, whichever is shorter. It also adds details to the log message to indicate which certificate it is logging about and a suggested action.
* Add go-tests-success job and make go-test-enterprise conditional
* fixing lint-32bit reference
* fixing reference to -go-test-troubleshoot
* add all jobs that fan out.
* fixing success job to need set up
* add echo to success job
* adding success jobs to build-artifacts, build-distros, and frontend.
* changing the name of the job in verify ci to be consistent with other workflows
* enable go-tests, build-distros, and verify-ci to run on merge to main and release branches because they currently do not with just the pull_request trigger
* Fix API GW broken link
* Update website/content/docs/api-gateway/upgrades.mdx
Co-authored-by: Tu Nguyen <im2nguyen@users.noreply.github.com>
---------
Co-authored-by: Tu Nguyen <im2nguyen@users.noreply.github.com>