This only affects vault versions >=1.1.1 because the prior code
accidentally relied upon a bug that was fixed in
https://github.com/hashicorp/vault/pull/6505
The existing tests should have caught this, but they were using a
vendored copy of vault version 0.10.3. This fixes the tests by running
an actual copy of vault instead of an in-process copy. This has the
added benefit of changing the dependency on vault to just vault/api.
Also update VaultProvider to use similar SetIntermediate validation code
as the ConsulProvider implementation.
When running 'make tools' the go command indirectly edits both the
go.mod and go.sum files in ways that can cause the later build of consul
itself to build with slightly different dependencies than it normally
would.
* modify gotestsum hacking that is unnecessary with the latest version
* try running 2 packages at a time
* try running 3 packages at a time
* remove old comments
* Upgrade xDS (go-control-plane) API to support Envoy 1.10.
This includes backwards compatibility shim to work around the ext_authz package rename in 1.10.
It also adds integration test support in CI for 1.10.0.
* Fix go vet complaints
* go mod vendor
* Update Envoy version info in docs
* Update website/source/docs/connect/proxies/envoy.md
* Add support for HTTP proxy listeners
* Add customizable bootstrap configuration options
* Debug logging for xDS AuthZ
* Add Envoy Integration test suite with basic test coverage
* Add envoy command tests to cover new cases
* Add tracing integration test
* Add gRPC support WIP
* Merged changes from master Docker. get CI integration to work with same Dockerfile now
* Make docker build optional for integration
* Enable integration tests again!
* http2 and grpc integration tests and fixes
* Fix up command config tests
* Store all container logs as artifacts in circle on fail
* Add retries to outer part of stats measurements as we keep missing them in CI
* Only dump logs on failing cases
* Fix typos from code review
* Review tidying and make tests pass again
* Add debug logs to exec test.
* Fix legit test failure caused by upstream rename in envoy config
* Attempt to reduce cases of bad TLS handshake in CI integration tests
* bring up the right service
* Add prometheus integration test
* Add test for denied AuthZ both HTTP and TCP
* Try ANSI term for Circle
* First conversion
* Use serf 0.8.2 tag and associated updated deps
* * Move freeport and testutil into internal/
* Make internal/ its own module
* Update imports
* Add replace statements so API and normal Consul code are
self-referencing for ease of development
* Adapt to newer goe/values
* Bump to new cleanhttp
* Fix ban nonprintable chars test
* Update lock bad args test
The error message when the duration cannot be parsed changed in Go 1.12
(ae0c435877d3aacb9af5e706c40f9dddde5d3e67). This updates that test.
* Update another test as well
* Bump travis
* Bump circleci
* Bump go-discover and godo to get rid of launchpad dep
* Bump dockerfile go version
* fix tar command
* Bump go-cleanhttp